Wednesday, March 11, 2009

Kitchen Progress

Over the past week:

1.  Cabinets have come the rest of the way out (and were sold).
2. Electrical outlets/lights have been moved.
3. Plumbing has been redirected.
4. Drywall has been patched.
5. Ceiling has been mostly planked (and will be painted white).
6. Purchased:  Cabinet hardware, faucet, pendant light (for above the sink).



Thanks Dad, for coming to help us!


I am now relegated to washing dishes in my laundry room sink!  We have been eating a lot of sandwiches, microwave food and the occasional dinner out--and of course crock pot meals. Less than two weeks and we will be back in the kitchen--in style.